|

|
The old pick up plate is dropped and inspected. There is a
crack on a previous weld and a new pick up plate was required. |
|

|
Fabrication begins on the new plate. The material is
measured and cut to size. |
|

|
The plate begins to take shape after the ends are bent into
position and the king pin is set in place. |
|

|
The structural supports and cross members are tacked into
place before final welding.
|
|

|
Here the pick up plate is welded, drilled, painted and ready
for installation.

|